Youthhostel Gerlos, Krimml

The aim of this project was to make affordable school trips possible in an ecological environment. That is why the hotel was built from regional wood in solid wood construction, the hotel is heated by biomass district heating, the journey is mainly by coach and the leftover wood of the cross-laminated timber walls was processed into furniture. The main structure of the hostel is designed as a longitudinal timber structure. The urban and spatial intention is to create a south-facing U-shaped “village square” between the main building and the street, which functions as a semi-public zone. This square is accompanied by two side wings, which are formed as landscape waves and allow the square to sink into the landscape. The aim of this project was to make affordable school trips possible in an ecological environment. That is why the hotel was built from regional wood in solid wood construction, the hotel is heated by biomass district heating, the journey is mainly by coach and the leftover wood of the cross-laminated timber walls was processed into furniture. The main structure of the hostel is designed as a longitudinal timber structure. The urban and spatial intention is to create a south-facing U-shaped “village square” between the main building and the street, which functions as a semi-public zone. This square is accompanied by two side wings, which are formed as landscape waves and allow the square to sink into the landscape. When entering the hostel via the village square, you are in the foyer. This is where the vertical development begins with suspended ramps and spacious air holes. These allows visual relationship into the deeper landscape on the other side of the building and to the sport areas inside. A climbing wall goes through this vertical development and starts on the lower leveled sport area.

""

""

Credits

Architecture
Lechner & Lechner Architects

Main contractor for wood construction
Ehrenreich BaugmbH

Client
Jugendgästehaus Gerlosplatte GmbH

Year of completion
2021

Location
Krimml, Austria

Total area
7.557 m2

Photos
Julian Hoeck

Project Partners

Forsthuber ZT GmbH, Andreas Pflügler GmbH, Golser Technisches Büro Gmbh, Ingenieurbüro Ing. Denis Gappmaier, Bestra GmbH, Optiplan engineering company for technical building equipment and energy industry GmbH

Related posts

Powered by